Simulation Systems for Interlockings and Control Centres
The very best training with realistic simulation
Smooth and safe railway operations – this is the task of the staff in interlockings and control centres. It is also a great responsibility. To help staff achieve trouble-free operation they are supported by complex control and safety systems. But do they know what to do if technology fails? What measures have to be taken when trains deviate from schedule, e.g. due to delays? The high density of rail traffic demands fast and confident reactions. Train controllers and dispatchers must therefore receive training which prepares them to deal with all possible situations so that they can manage disruptions in operation quickly and appropriately.


Economical and practice-oriented training for train controllers and dispatchers
Funkwerk Information Technologies offers an economic concept for realistic simulation of interlocking operation for training purposes. The simulation is adapted for all interlocking designs and manufacturer-independent.


The advantages of this system:
Separation of commissioning and training
All functions can be trained long before an interlocking goes into service
Interlocking and train operations are not affected
Hazard-free training of incidents and stress handling
Shorter training periods which can be planned without restriction
Reduction of expensive temporary alternative measures
Independent of manufacturer and interlocking type
Training is of higher quality


Modular structure caters for individual requirements
With their modular structure Funkwerk IT’s training systems can simulate all functions performed by interlockings including those of external installations (signals, points etc.) and of course any train or shunting movements defined by the user. The simulation programme has a wide repertoire of technical and operational malfunctions, accidents and hazards which provides optimal training of staff for their daily work and enables them to master every situation with confidence. The simulation system covers the following training phases:

Basic Training
Interlocking operation and operations processes
Operations regulations

Preliminary Training for New Interlockings
Training prior to commissioning of new interlockings
New functions and operations processes

Repeat Training
Regular stress training and incident management
Re-training after errors and non-compliance with regulations


Simulation of Interlocking Logics and External Installations
The real topography of every section served by an interlocking can be shown in the simulation system. The special features of the interlocking logics are taken into account, as are any variations in the user and display interfaces of equipment from different manufacturers. The runtime performance of the interlocking and the external installations is reproduced in real time (e.g. route setting).

Simulation of interlocking logics and external installations
Simulation of interlocking logics and external installations
Simulation of Train and Shunting Trips
The system permits simulation of any number of train trips. The trains are generated from the timetable. Furthermore, any train and shunting movements defined by the user can be generated online at any time, applying realistic section and vehicle parameters and corresponding dynamics.

Input of train and shunting trips
Input of train and shunting trips
Simulation of Technical and Operational Failures
Malfunction of all important external installations can be simulated in detail. Other disruptions (delays, longer stopping times, technical failures in trains etc.) can also be entered into the system. The possibility of reproducing failures which have actually occurred greatly improves controllers’ ability to deal with real emergencies and prepares them for stress situations. In this way staff achieve a high degree of competence in handling such situations.

Input of technical and operational failures
Input of technical and operational failures
Section and Network Simulation
To train co-operation between several interlockings and operators, a number of interlocking sections – even if they use different technology – can be combined to form a section or network simulation programme. This function is supported by a convenient configuration tool.


Simulation of Train Number Indication and Train Routing
Train number indication and automatic train routing can also be integrated into Funkwerk IT’s training system for train controllers and dispatchers.